The Munich public works department hired mbeam for a light installation and sound orchestration to support an event. At the same time it was intended to flip the switch from past to future. The light installation took place on the 20.000 square meter big construction site, the future technology park M-Campus. The light installation along with a dramatic sound composition lasted 10 minutes and portrays the development of the area – from heavy industry terrain to a pioneering technology park for innovative companies through extensive revitalizing work.


ProjectCity of Munich - Light and sound-installation, roofing ceremony (idea, concept, composing, direction and implementation)